Markyln Site Contractor Inc, 25 Mansion Road, Cheshire CT - 06410 - 3405

School - Quinnipiac University - Bobcat Way

Bobcat Way

Bobcat Way is the central accessway through the main Quinipiac campus. There were two phases of work that were performed. Together, both phases took two years to complete. At one point, Marklyn's crews worked 7 days a week for 7 weeks straight.

The work performed included:

  • widening the existing road
  • removed existing concrete sidewalks and replaced with brick sidewalks
  • installed a culvert,
  • re-routing waterways while protecting wildlife
  • installed new concrete curbs
  • installed storm drainage system
  • landscaped
  • paved 